Hydroelectric Plant

27 Dragones Front

On this page you can find the necessary help to successfully complete the location Hydroelectric Plant, part of the Sidequest «Tail of the Monkey», in Mobile and Pc Version. Here you can find the tasks, walkthrough videos in Mobile and Pc Version, timestamps, energy cost and details. Also you can find walkthrough maps provided by Roeland.

Subscribe to our YouTube Channel to not miss all the news and events of Diggy’s Adventure! Remember that if you have a problem with this location, do not hesitate to contact us.

Tasks

Walkthrough Video – Mobile Version

  • 0:00 – Go to the location

Walkthrough Video – Pc Version

  • 0:00 – Go to the location

Details

Here you can find the number of tiles and the energy cost to get the clear bonus

MapHydroelectric Plant
Tiles450
Energy Required283,510energy icon
Clear Bonus28,000 xp icon

Maps

Provided by Roeland

(click on the image to enlarge)

21-1 Hydroelectric Plant
1
21-2 Hydroelectric Plant
2
21-3 Hydroelectric Plant
3

Links

Banner Side Quests 3
Banner Dragon of Metal
YouTube Link